Skip to content

End-to-end lead time

Key: home/E2ELeadTimeChart

Measures end-to-end lead time from a source project's promotion to a target project's promotion. Useful for tracking how quickly a change flows from one service to another (e.g. library → application).

Configuration

Field Type Description
project string Source project name.
branch string Source branch name.
promotionLevel string Source promotion level.
targetProject string Target project name.
targetBranch string Target branch name.
targetPromotionLevel string Target promotion level.
interval string Bucket size for the chart (e.g. "1d", "1w").
period string Time window to display (e.g. "1M", "3m").

When a promotion level is missing

Both ends are resolved by name every time the widget is displayed. If either configured promotion level does not exist any more, the widget title still names both ends, marked as (not found), and the widget body says which end is missing instead of a chart. Edit the dashboard and reconfigure the widget to point it at existing promotion levels.